HOME > backdround >Investment analysis
  Investment analysis | Saving Energy For Better World.
Costdown [ materal, labor cost, manufacturing cost

 

1] Content of modification
Installation of Drain trap


2] Cost-down facts
Install condensate drain from critical points in the compressed air system without any loss of compressed air.- Operating cost-down.

 

 

Air leak points : 33 points
Comp'(Inter-cooler, After-cooler, Separator) : 21 points
Air receiver : 4 points
Dryer : 8 points

 

Manual ball valve for condensate : 4 points

Amount of 7Kg/㎤ pressure air leak at 4 points: 1,116㎥ (reference to air flow chart)

 

Air leak volume of comp room at factory #2

1,116㎥/min x 33 points = 38,478㎥/min
* Air capacity of piston type of 300 hp : 38.2㎥/min

 

Air loss cost of factory #2 comp' room

39.478㎥/min x 9.6won/㎥(unit cost of air/1㎥) = 369.39won/min
* Amount of air loss per year :146,277,962won (reference to air flow chart)

 

mount of energy saving by installing drain trap at factory #2 comp. room

146,277,946won/annual.


 
Freeback period of investment analysis

 

Investment : 38,357,000 won
Installation fee : 30,000,000 won
Deprecation cost : 3,857,000 won /year
Financial cost : 4,500,000 won/year

 

Saving facts
Operating cost down : 146,277,964won/year

 

Expectation money

146,000,000 won/annual

 

Feedback on investment

0.21month

 
Unitcostper 1m3in compressed air

 

<Condition>
Comp' : 250HP(PISTON TYPE)
Loading rate : 80%, Efficiency : 80%
30.4㎥/minx60x0.8x0.8=1.167㎥/hr

 

Electricity

Compressor motor : 188KW
Moto for ooling water : 5KW
Unit cost of electricity : 51won /KWH
{(188 + 15KW) x 51won}÷1,167㎥/hr = 8.87won/㎥

 

Maintenance fee (6,000,000won per year : result of 1997)

6,000,000won÷(1,167㎥ x 24hr x 300day)= 0.71won/㎥

 

Facility depriciation fee

Price of compressor : 50,000,000won, Dryer : 20,000,000won and life of them : 20 years.
{(70,000,000won-7,000,000won)÷20 year}÷ (1,167㎥/hrx24hrx300day)
= 0.37won/㎥

 

Depriciation fee of absorption gel : 3,000,000 won/5 year

(3,000,000won-300,000won)÷5years}÷ (1167㎥/hrx24hrx300day) = 0.06won/㎥

 

Unit cost of 1

1+2+3+4 = 9.6won /㎥